Railway Margins

Follow a thread

Railways

4 stories found Clear filters ↗

The archive

Railways

4 stories

What ballast does beneath the sleepers

The crushed stone under a railway sleeper must hold the track in place while leaving water a way out. Its condition can change a line's geometry long before the rail itself wears out.

The timetable hidden inside a passing loop

A passing loop is a brief stretch of double track on a single-track railway. Its location and length decide where trains can meet, how timetables fit together, and how delays spread.

How steel rails make room for summer

Long welded rails have few expansion gaps. Their summer margin lies in a chosen neutral temperature and in the fastenings, sleepers and ballast that hold them straight.